• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
APPENDIX III DAMAGE CONTROL SYMBOLOGY - Continued
APPENDIX III DAMAGE CONTROL SYMBOLOGY - Continued

Damage Controlman
Page Navigation
  290    291    292    293    294  295  296    297    298    299    300  
img
HOLE
Explanation
Example
H
H
Hole Reported
4 IN Frame 96, STBD
(Size in IN or FT)
(SIZE)
2 FT off deck
(use of "or" not allowed)
(Pinpoint the Damage)
Hole Patching or
H
Plugging in Process
H
4 IN Frame 96, STBD
2 FT off deck
H
EXAMPLE-Final Triangle for DC Plates
EXAMPLE-Final Triangle for DC Plates
H
4 IN Frame 96, STBD
2 FT off deck
RUPTURE
Explanation
Example
R
R
Rupture Reported
(System, if known)
FM
(System)
(Pinpoint the Damage)
FM Frame 155 STBD, Overhead
Rupture Isolated
R
R
FM
(System)
FM Frame 155 STBD, Overhead
R
R
Rupture Bypassed
(How, Where)
FM
Jumpered Around
FM Frame 155 STBD, Overhead
Ruptured System Repaired
R
R
EXAMPLE-Final Triangle for DC Plates
and COVs Opened
FM
Jumpered Around
FM Frame 155 STBD, Overhead
DCfAIV13
AIII-13






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.