CHAPTER 1 ENGINEERING DEPARTMENT ORGANIZATION
FIGURE 1-1. SHIPBOARD BATTLE ORGANIZATION
FIGURE 1-2. SHIPBOARD ADMINSITRATION ORGANIZATION
THE ENGINEERING ORGANIZATION
Figure 1-4.-Format for a functional guide.
THE ENGINEER OFFICER
PROSPECTIVE ENGINEER OFFICER
Specific Duties
THE MAIN PROPULSION ASSISTANT
THE ELECTRICAL OFFICER
ENGINEERING DIVISIONS
Auxiliaries Division
ENGINEERING DIVISION PERSONNEL
The Technical and Material Assistant
ENGINEERING DEPARTMENT WATCH ORGANIZATION
UNDERWAY WATCHES
The Officer of the Deck
The Damage Control Watch
Engineering Watches - 14079_31
IN-PORT WATCHES
Engineering Watches - 14079_33
DIRECTIVES
SHIPS BILLS
CHAPTER 2 RECORD SYSTEMS
LEGAL RECORDS
Figure 2-1.-The Engineering Log.
Figure 2-1.-The Engineering Log-Continued. - 14079_40
Figure 2-1.-The Engineering Log-Continued. - 14079_41
Figure 2-1.-The Engineering Log-Continued. - 14079_42
Figure 2-2.-Engineers Bell Book.
OPERATING RECORDS
Propulsion Steam Turbine and Reduction Gear Operating Record
Boiler Room Operating Record
GAS TURBINE OPERATING RECORD
Electrical LogShips Electric Plant
Flash Type Distilling Plant Operating Record
REFRIGERATION/AIR CONDITIONING EQUIPMENT RECORD
Refrigeration/Air Conditioning Equipment Operating Record. A. Front B. Back.
DAILY FUEL AND LUBE OIL ACCOUNT
FUELING MEMORANDUM
OIL KINGS MEMORANDUM
Cover Sheet and Monthly Boiler Data
Feedwater Chemistry Worksheet/log
Boiler Water Chemistry Worksheet/Log
Reserved Makeup Feedwater Tests Log
3-M SYSTEMS
SHIPS MAINTENANCE ACTION FORM
STEAMING ORDERS
DEGAUSSING FOLDER
BOILER TUBE FAILURE REPORTS
Boiler Tube Failure Report
Boiler Tube Renewal Sheet for a Babcock & Willcox Double Furnace Boiler
SHIP CHARACTERISTICS CARDS
Figure 2-18.-Boiler Tube Renewal Sheet for a Foster-Wheeler Single Furnace Boiler-continued
Summary of Situation Reports
MAIN PROPULSION TURBINE CONDITION REPORT
Chapter 3 Training
SHAKEDOWN AND REFRESHER TRAINING
SHIPBOARD TRAINING
Educational Service Officer
TYPES OF TRAINING
Military Training
A sample record of courses for advancement
A sample individual drill record for engine-room personnel.
Leadership Training
Long-Range/Quarterly Training Plan.
Sample Monthly Training Plan
Division Training Schedule
TYCOM Required Training Exercises, Trials, and Inspections
Record of Qualifications at Watch/Battle Stations
Record of Progress Chart
Available Off-Ship Training, R Division
Long-Range Training Plan
Format for scheduling and planning off-ship training
Quarterly Training Plan
Division Officer's Personnel Record Form
Division Officer's Personnel Record Form-Continued
Other Training Records
Chapter 4 Engineering Operations
GENERAL PROCEDURES - 14079_94
GENERAL PROCEDURES - 14079_95
SAFETY PRECAUTIONS AND OPERATING INSTRUCTIONS
A sample warming-up schedule for an engine room
SECURING SCHEDULES
ENGINEERING READINESS TRIALS
READINESS INSPECTIONS
Administrative Inspection
PROPULSION EXAMINATION BOARD
INSURV Material Inspection
INSURV Material Inspection - CONTINUED
ENGINEERING OPERATIONAL SEQUENCING SYSTEM (EOSS)
ENGINEERING OPERATIONAL CASUALTY CONTROL (EOCC)
CHAPTER 5 ENGINEERING MATERIAL
MATERIAL CONTROLLED BY MILITARY COMMANDS
TYPES OF MATERIAL
COGNIZANCE SYMBOLS
Allowance Lists
THE SUMMARY OF EFFECTIVE ALLOWANCE PARTS/EQUIPAGE LISTS
Figure 5-2.-COSAL index, part 1, section A.
Figure 5-3.COSAL index, part 1, section C.
ALLOWANCE PARTS LIST (APL)
ALLOWANCE EQUIPAGE LIST (AEL)
Figure 5-5.-Example of an AEL.
STOCK NUMBER SEQUENCE LIST (SNSL).
Supply Publications
SUPPLY OVERHAUL
REPAIR PARTS PROCEDURES AND PROCUREMENT
PREPARATION OF NAVSUP 1250
MILITARY STANDARD REQUISITIONING AND ISSUE PROCEDURE (MILSTRIP)
MILSTRIP REQUISITIONS
UNIFORM MATERIAL MOVEMENT AND ISSUE PRIORITY SYSTEM (UMMIPS)
Figure 5-11.-Issue priority designators.
CONTROLLED EQUIPAGE PROCEDURES
INVENTORY OF CONTROLLED EQUIPAGE
SURVEYS
Figure 5-13.-Relationship of the Navy Stock Fund (NSF) and the Navy Stock Account (NSA).
FUND CODES
SUPPLY PETTY OFFICERS RECORDS
SUPPLY PETTY OFFICERS RECORDS - CONTINUED
CHAPTER 6 ENVIRONMENTAL POLICIES AND PROCEDURES
PREVENTING OIL SPILLS
HANDLING OIL SPILLS
SHIPBOARD SEWAGE AND WASTE DISPOSAL
Figure 6-3.Strainer-type CHT system
FUEL OIL STORAGE AND HANDLING
PRECAUTIONS IN HANDLING FUEL OIL
FUELING RESPONSIBILITIES AND PROCEDURES
FUELING RESPONSIBILITIES AND PROCEDURES - CONTINUED
BALLASTING SYSTEM
BALLASTING SYSTEM - CONTINUED
CHAPTER 7 MAINTENANCE ADMINISTRATION
NAVAL SHIP ENGINEERING CENTER - CONTINUED
AFLOAT STAFFS
DUTIES OF STAFF PERSONNEL
Staff Assistants
POLICY AND PROCEDURES FOR FLEET CASUALTY REPORTS (CASREP)
DETECTION, ACTION, AND RESPONSE TECHNIQUE (DART) PROGRAM
Problem Identification Phase
Figure 7-3.-DART implementation plan.
FIGURE 7-4A.--EQUIPMENT IMPROVEMENT PROGRAM, MAJOR MILESTONES
Progressing Phase
Figure 7-5B.-Funding plan (DART) (explanation for using chart).
Figure 7-6A.-Equipment improvement program, milestones.
FIGURE 7-7A.--EQUIPMENT INMPROVEMENT PROGRAM, PERFORMANCE COMPARISON
Figure 7-7B.-Equipment improvement program, performance comparison (actual vs. objectives) (instructions for using chart).
RESPONSIBILITIES OF PERSONNEL
Figure 7-8B.-Evaluation of goats (explanation for using chart).
THE 1200 PSI BOILER PROGRAM
FLEET MODERNIZATION PROGRAM
FMP CHANGES
CHAPTER 8 THE QUALITY ASSURANCE PROGRAM
QA PROGRAM COMPONENTS
THE DIVISION OFFICER
QUALITY ASSURANCE TRAINING AND QUALIFICATION
The Controlled Work Package
Levels of Assurance
Figure 8-1.QA Form 12, Departure from Specification Request.
QA FORMS AND RECORDS
Figure 8-3.-QA Form 2, New Material In Process Control Tag.
Figure 8-4.-QA Form 3, Material Reject Tag.
QA FORM 4, SHIP TO SHOP TAG
Figure 8-6.-QA Form 7, Controlled Material Inventory/Record.
Figure 8-7.-QA Form 17, Test and Inspection Form-Other than NDT.
Figure 8-8.-QA Form 34, Torque/Controlled Assembly Report.
CHAPTER 9 SHIP AVAILABILITIES, REPAIR ACTIVITIES, AND SHIP TRIALS
REPAIRS AND ALTERATIONS
REPAIR ACTIVITIES
Repair Officer
ARRIVAL CONFERENCE
SHIP REPAIR FACILITIES
PRODUCTION DEPARTMENT
PLANNING DEPARTMENT
PRODUCTION DEPARTMENT (SHOPS)
FIGURE 9-3. ORGANIZATION OF A TYPICAL NAVAL SHIPYARD PLANNING DEPARTMENT
FIGURE 9-4. ORGANIZATION OF A TYPICAL SHIPYARD PRODUCTION DEPARTMENT
Figure 9-6.-Organization of a typical production department shop.
The Ship Superintendent
SUPERVISOR OF SHIPBUILDING, CONVERSION AND REPAIR
SUPSHIP DEPARTMENTS
The Planning Department
ADVANCE PLANNING
ASSIST-SHIPS-FORCE FUNDS
INCLINING EXPERIMENTS
CONTRACT TRIALS
SPECIAL TRIALS
ECONOMY TRIALS
VIBRATION TRIALS - CONTINUED
CHAPTER 10 OCCUPATIONAL HEALTH
IDENTIFYING ASBESTOS HAZARDS
Personal Protective Clothing
THE HEARING CONSERVATION PROGRAM
PERSONAL HEARING PROTECTIVE DEVICES
TRAINING
SIGHT CONSERVATION PROGRAM
EYE HAZARD
PROGRAM ELEMENTS
SELECTING RESPIRATORS
THE HAZARDOUS MATERIAL/WASTE PROGRAM
STORING HM/HW
COLLECTING AND DISPOSING OF HAZARDOUS WASTE
APPENDIX I REFERENCES USED TO DEVELOP THE TRAMAN - 14079_219
APPENDIX I - CONTINUED - 14079_220
APPENDIX I - CONTINUED - 14079_221
APPENDIX I - CONTINUED - 14079_222
INDEX
INDEX - CONTINUED - 14079_224
INDEX - CONTINUED - 14079_225
INDEX - CONTINUED - 14079_226
INDEX - CONTINUED - 14079_227
INDEX - CONTINUED - 14079_228
ASSIGNMENT QUESTIONS - 14079_229
ASSIGNMENT QUESTIONS - 14079_231
ASSIGNMENT QUESTIONS - 14079_232
ASSIGNMENT QUESTIONS - 14079_233
ASSIGNMENT QUESTIONS - 14079_234
ASSIGNMENT QUESTIONS - 14079_235
ASSIGNMENT QUESTIONS - 14079_236
ASSIGNMENT QUESTIONS - 14079_237
ASSIGNMENT QUESTIONS - 14079_238
ASSIGNMENT QUESTIONS - 14079_239
ASSIGNMENT QUESTIONS - 14079_240
ASSIGNMENT QUESTIONS - 14079_241
ASSIGNMENT QUESTIONS - 14079_242
ASSIGNMENT QUESTIONS - 14079_243
ASSIGNMENT QUESTIONS - 14079_244
ASSIGNMENT QUESTIONS - 14079_245
ASSIGNMENT QUESTIONS - 14079_246
ASSIGNMENT QUESTIONS - 14079_247
ASSIGNMENT QUESTIONS - 14079_248
ASSIGNMENT QUESTIONS - 14079_249
ASSIGNMENT QUESTIONS - 14079_250
ASSIGNMENT QUESTIONS - 14079_251
ASSIGNMENT QUESTIONS - 14079_252
ASSIGNMENT QUESTIONS - 14079_253
ASSIGNMENT QUESTIONS - 14079_254
ASSIGNMENT QUESTIONS - 14079_255
ASSIGNMENT QUESTIONS - 14079_256
ASSIGNMENT QUESTIONS - 14079_257
ASSIGNMENT QUESTIONS - 14079_258
ASSIGNMENT QUESTIONS - 14079_259
ASSIGNMENT QUESTIONS - 14079_260
ASSIGNMENT QUESTIONS - 14079_261
ASSIGNMENT QUESTIONS - 14079_262
ASSIGNMENT QUESTIONS - 14079_263
ASSIGNMENT QUESTIONS - 14079_264
ASSIGNMENT QUESTIONS - 14079_265
ASSIGNMENT QUESTIONS - 14079_266
ASSIGNMENT QUESTIONS - 14079_267
ASSIGNMENT QUESTIONS - 14079_268
ASSIGNMENT QUESTIONS - 14079_269
ASSIGNMENT QUESTIONS - 14079_270
ASSIGNMENT QUESTIONS - 14079_271
ASSIGNMENT QUESTIONS - 14079_272
ASSIGNMENT QUESTIONS - 14079_273
ASSIGNMENT QUESTIONS - 14079_274
ASSIGNMENT QUESTIONS - 14079_275
ASSIGNMENT QUESTIONS - 14079_276
ASSIGNMENT QUESTIONS - 14079_277
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business