BOMB ASSEMBLY
TRAY (4 REQD) FOR
ASSEMBLED PLATFORM
STANDS
TRAY STOP
BUMPERS
PLATFORM STAND
BRACE &
BRACKET
TRAY STOP
MN020016
HANDLES
SUPPORT
SECTION
Figure 2-16.--Bomb assembly stand.
revised methods, practices, or procedures; therefore,
Shore-Based/Shipboard Operations, NAVSEA
you need to ensure that you are studying the latest
S W 0 2 3 - M 3 - W H S - 0 1 0 , N ava l S e a S y s t e m s
revision.
Command, Washington, DC, 1990.
Mine Components A through C; Description and
Class-B Criteria, NAVSEA SW550-AA-MMI-
for Handling, Storing, Production, Renovation, and
010, Naval Sea Systems Command, Washington,
Shipping, NAVSEA OP 5, Volume 1, Naval Sea
DC, 1988.
Systems Command, Washington, DC, 1990.
Motor Vehicle Driver and Shipping Inspector's Manual
Bomb Assembly Platform Stand, A/F32K-1A Part
for Ammunition, Explosives, and Related
Number 551AS100-1 and Small Bomb Assembly
Hazardous Materials, NAVSEA SW020-AF-
P l a t f o r m S t a n d A / F 3 2 K - 1 0 Pa r t N u m b e r
A B K - 0 1 0 , N ava l S e a S y s t e m s C o m m a n d ,
551AS200-1, NAVAIR 19-15-27, Naval Air
Washington DC, 1980.
Systems Command, Washington, DC, 1989.
Periodic Testing Arrangements for Ordnance Handling
Equipment, NAVSEA SG420-AP-MMA-010,
Materials Handling Equipment (MHE), NAVSEA
Naval Sea Systems Command, Washington, DC,
SW023-AH-WHM-010, Naval Sea Systems
1990.
Command, Washington, DC, 1976.
Handling, Packaging, Storing, and Transportation of
2-23