• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STEAMING  ORDERS
BOILER TUBE FAILURE REPORTS

Engineering Administration - Administrative Structural engineering guide book
Page Navigation
  44    45    46    47    48  49  50    51    52    53    54  
Figure 2-15.-Steaming Orders (sample). replacement.  Include  the  mark,  modification,  and  serial ship’s position and headings; and (4) a record of the number  of  the  gyrocompass  for  which  the  book  is degaussing  range  runs.  The  Degaussing  Folder  is intended. necessary to the operation of the degaussing system and DEGAUSSING FOLDER must  be  safeguarded  against  loss.  Generally,  the navigator  keeps  the  Degaussing  Folder  with  the  names The ship’s Degaussing Folder is a record of the of engineering personnel who will use it. degaussing  installation  in the ship.  The folder contains (1) a description of the degaussing installation; (2) a The  Ship’s  Degaussing  Action  Log,  NAVSEA record  of  inspections,  tests,  and  repairs  performed  by 8950/19, is provided for recording maintenance of the repair  activities; (3) the values of all coil currents for the degaussing  system  performed  by  the  ship’s  force.  When 2-26







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.