• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11-8. CCA/decontamination station for CPS-equipped
REVIEW ANSWERS

Damage Controlman
Page Navigation
  208    209    210    211    212  213  214    215    216    217    218  
SUMMARY
In this chapter, you have been introduced to
R A D I AC i n s t r u m e n t s , r a d i o l o g i c a l s u r v e y s ,
radiological exposure control, and personnel
decontamination and shipboard decontamination
installations. You will need a good understanding of
the radiac instruments since you will use them in the
performance of your duties if you are assigned to the
radiological monitoring team. When you conduct
Planned Maintenance System on the radiac
instruments, look them over and review the technical
manuals supplied with the instruments. Discuss your
repair party chemical, biological, and radiological
assignments with your Leading Petty Officer so that
you can relate the information presented in this chapter
to your actual assignments. Review the various
sections of this chapter as necessary until you are
familiar with them.
11-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.