DRILL PLAN CONSTRUCTION
DATE:
This is the point at which individual drills are
START TIME: ________SECURE TIME: _________
incorporated into a tactical scenario. Items to include
TRAINING MODE:
in the drill plan are as follows:
Date/Scenario #/watch team, that is,
CSTT
TRAINING
EVALUATION
yymmdd/ASUW 1/ASUW Blue
STT
TRAINING
EVALUATION
Purpose. The overall purpose of the drill, that is,
MTT
TRAINING
EVALUATION
train/evaluate the watch team's response to
DCTT
TRAINING
EVALUATION
USW/AAW threats to include such skills as
ETT
TRAINING
EVALUATION
threat detection, threat evaluation, engagement,
a n d c o m m u n i c a t i o n s p r o c e d u r e s . O r, t o
ATT
TRAINING
EVALUATION
train/evaluate the electronic repair team's
response to casualties/faults in the combat
via hand-held radios on Channel "A."
systems to include casualty/fault recognition,
reporting, and repair/reconfiguration in a hostile
Overview: The overall objective of this scenario is to
environment.
train/evaluate the watch team in 7responding to a small
boat attack, which caused topside damage and a man
Requirements: Necessary equipment and the
overboard. The training team will be evaluating/training
operational state of that equipment at
the watch standers in the following areas:
commencement of the drill.
Geopolitical Situation: ITT leaders read geopolitical
Remarks: A brief outline of the major events that
situation for the drill and refer team members to order of
occur during the drill, that is, SUW threat turns
battle, include current readiness condition of ship, OOC
AW at T+30, or cascading equipment casualties
or degraded.
occur at T+35, and so forth.
Equipment Configuration: Review equipment
Training team member positions.
necessary for the conduct of the scenario/timeline and
the operational state of that equipment at
-- By name, who will be where.
commencement of the drill. Additionally, significant
-- O n e i n d iv i d u a l m a y o b s e r ve s eve r a l
changes to equipment configuration.
positions.
Timeline Review: ITT leader will review timeline, as
he/she notes the start of an individual training team drill
-- Problem control positions.
within the scenario. Each team leader will provide the
Casualties.
following information:
-- Time to be imposed: that is, T+15.
CSTT
Small boat attack
-- Who will impose the casualty?
CIC
Command, Control, Communication
Drill/Training Event #: CSCCE DG01/SLQ-32;
STT
Man overboard shipboard recovery
ITT TSSE #3, and so forth.
DCTT
Topside damage
Drill/Training Event Description: "SLQ-32
1. Objective (to train/evaluate repair three damage
computer failure", KILO/FPB attack with hit A
control team in combating hull damage and
and B.
Submit the drill plan for the commanding officer's
2. How the drill will be evaluated.
approval. Once approved, the drill plan and all
associated materials make up a completed drill package.
3. Who is going to impose drill.
4. How drill will be imposed (simulation and
SAMPLE ITT DRILL PLAN/BRIEFING GUIDE
deviations).
USS____________________
5. Cascading effects of drill, if any (that is,
ITT EXECUTIVE BRIEF
CASREP equipment, ETRs, battle damage).
13-12