WARNING
While this DED configuration is manpower and
rapid decontamination of vehicles and equipment
(eight vehicles processed per hour).
This layout uses dual lanes at stations 1, 4, and 5
VI.Chemical unit leaders must consider the impact
to process two vehicles at once. Since the most
of the work/rest cycle on the ability of their
time and labor-intensive work takes place at
operation to process vehicles through DED.
station the 3, this station is designed to process
Failure to initiate a work/rest cycle could result in
three vehicles at a time. The processing rate of
heat casualties and failure.
this configuration mission will be affected by any
work/rest cycle
.
Table 6-8.--Optimum M12A1 PDDA-Equipped DED Setup
6-30