Electrical power system, 2-1 to 2-14
control and protection devices, 2-5
distribution system, 2-2 to 2-5
distribution system drawings, 2-11 to 2-14
poles and guys, 2-6 to 2-9
transformers, 2-4 to 2-5
transmission system, 2-2
Electronic distance-measuring equipment, 12-1 to 12-5
light wave instruments, 12-1
microwave instruments, 12-1
slope distance reduction, 12-3 to 12-5
Electronic positioning systems, 12-5
Engineering division, 14-3 to 14-13
drafting and reproduction section, 14-3 to 14-8
field engineering section, 14-8 to 14-11
materials testing section, 14-11 to 14-13
Engineering technical library, 14-5
F
Fasteners, 1-14 to 1-16
driftpins, 1-15
shear plates, 1-15
split rings, 1-15
timber fasteners and connectors, 1-14 to 1-16
toothed rings, 1-16
Fineness modulus, 13-23
Flash point tests, 13-44
Foundations, 1-5 to 1-6
Freeze-thaw test, 13-23, 18-7
French drain, 3-10
G
Geological surveys, 16-1 to 16-3
H
Horizontal curves, 3-3 to 3-4, 11-1 to 11-12
arc definition, 11-4
Horizontal curvesContinued
chord definition, 11-5
curve formulas, 11-6 to 11-7
layout, 11-10
terminology, 11-2 to 11-4
types, 11-2
HVAC systems, 4-4 to 4-1
air-conditioning systems, 4-7 to 4-10
drawings, 4-10
radiant-heating systems, 4-7
steam-heating systems, 4-6
water-heatings systems, 4-6
Hydrometer analysis, 13-16 to 13-19
I
Instrument adjustment, 6-2 to 6-9
level adjustment, 6-3 to 6-5
minor repairs and replacement, 6-9
transit adjustment, 6-5 to 6-9
Instrument care, 6-1 to 6-2
L
Land surveyor responsibilities, 10-33
Land surveys, 10-30 to 10-37
monuments, 10-34
precision, 10-36
procedures, 10-34
Laser level, 12-6 to 12-8
Latitude, 15-14 to 15-17
by altitude of the sun, 15-15
Level computations, 7-4 to 7-7
adjusting intermediate bench marks elevations,
7 -5
adjusting level nets, 7-6 to 7-7
calculation allowable error, 7-6
INDEX-3