Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INDEX - CONTINUED - 14069_664
INDEX - CONTINUED - 14069_666
Engineering Aid 3 - Beginning Structural engineering guide book
Page Navigation
627
628
629
630
631
632
633
634
635
636
637
Materials testing section, assignment to,
16-12
Materials testing: soil and concrete,
15-1
to
15-39
concrete testing,
15-34
to
15-39
concrete tests,
15-34
to
15-36
preparation of concrete specimens,
15-37
to
15-39
slump tests,
15-36
to
15-37
physical characteristics of soils,
15-3
to
15-6
compactness,
15-4
effects of soil characteristics,
15-6
gradation,
15-4
organic soils,
15-6
particle shape,
15-3
particle size,
15-3
soil moisture,
15-4
to
15-6
specific gravity,
15-4
soil classification,
15-6
to
15-7
soil
soil
soil
classifying soils,
15-6
classification tests,
15-7
origin,
15-1
to
15-2
residual soil,
15-1
soil formation,
15-1
transported soil,
15-1
to
15-2
sampling,
15-7
to
15-17
disturbed samples,
15-9
to
15-11
quartering samples,
15-16
to
15-17
sampling methods,
15-7
tagging samples,
15-9
undistributed samples,
15-11
to
15-16
testing,
15-17
to
15-34
Atterberg limits,
15-29
to
15-34
determining moisture content,
15-18
to
15-21
mechanical analysis,
15-21
to
15-25
specific gravity testing,
15-25
to
15-29
Mechanical lettering,
3-37
to
3-41
lettering system,
3-41
line weights,
3-39
maintenance of mechanical
lettering
equipment,
3-40
to
3-41
operating procedures,
3-39
to
3-40
pens,
3-38
to
3-39
spacing and centering,
3-40
templates,
3-38
Mechanical power measure,
1-33
Mechanical systems and plan,
8-1
to
8-24
mechanical plan,
8-17
to
8-24
mechanical symbols,
8-21
fitting symbols,
8-22
to
8-23
fixture symbols,
8-24
piping symbols,
8-21
to
8-22
valve symbols,
8-23
to
8-24
Mechanical systems and plan—Continued
mechanical plan—Continued
plumbing layout,
8-20
to
8-21
waste and soil
drainage
diagram,
8-19
to
8-20
water supply and distribution
diagram,
8-17
to
8-19
mechanical systems (plumbing),
8-1
to
8-
17
sanitary drainage system,
8-10
to
8-17
branches,
8-17
fittings,
8-11
to
8-13
joint and connections
8-14
piping materials,
8-10
to
8-11
traps,
8-14
to
8-15
vents,
8-15
to
8-16
water distribution system,
8-1
to
8-10
fittings,
8-3
to
8-6
joints and connections,
8-6
pipe insulation,
8-10
pipe supports,
8-8
to
8-9
piping materials,
8-1
to
8-3
valves,
8-6
to
8-8
Measurements, units of,
1-26
to
1-34
Mil system,
1-30
Multi-view projection,
5-3
to
5-20
N
Nails,
6-49
Naval Mobile Construction Battalion’s standard
draftsman kit,
2-3
Noncircular curves,
4-14
to
4-16
ellipse by concentric-circle,
4-16
ellipse by four-center method,
4-16
ellipse by pin-and-string method,
4-15
O
Oblique drawing techniques,
5-26
to
5-28
Oblique single-plane projection,
5-24
to
5-28
Octagon,
4-10
Odor test,
15-21
Office work, surveying,
11-7
to
11-12
Ogee curves,
4-14
Orthographic projection,
5-3
to
5-24
Overhead power distribution,
9-2
to
9-6
Overlay sketches,
5-36
INDEX-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business