Reproduction, drawing, 3-41 to 3-51
reproduction machines, 3-42 to 3-50
reproduction materials, 3-50 to 3-51
reproduction room, 3-42
Reproduction materials, 3-50 to 3-51
blueprint paper, 3-50
sepia line intermediates, 3-50 to 3-51
Reptiles and insects, recognizing and avoiding
poisonous, 12-28
Reverse curves, 4-14
Roof framing, 6-20 to 6-27
rafter layout, 6-21 to 6-25
roof pitch, 6-20 to 6-21
roof trusses, 6-26 to 6-27
Route surveys, 11-3
S
Sample survey field notes, AV-1 to AV-8
Sanitary drainage system, 8-10 to 8-17
branches, 8-17
fittings, 8-11 to 8-13
joints and connections, 8-14
piping materials, 8-10 to 8-11
traps, 8-14 to 8-15
vents, 8-15 to 8-16
Scale, drafting, use of, 3-10
Scales, 2-16 to 2-21
architects scales, 2-17 to 2-19
engineers scale, 2-19 to 2-20
metric scale, 2-21
triangular scale clip, 2-21
Scientific pocket calculator, 1-25 to 1-26
Screws, 6-50
Section lines, 3-24 to 3-25
Sepia line intermediates, 3-50 to 2-51
Sexagesimal or North American system, 1-30
S h o p d r a w i n g s , 1 0 - 1
Sill framing and layout, 6-14 to 6-16
Sketching, 5-29 to 5-37
Slaking test, 15-21
Slope chaining, 12-13 to 12-14
Soil classification, 15-6 to 15-7
classifying soils, 15-6
classification tests, 15-7
Soil drainage and waste diagram, 8-19 to 8-20
Soil origin, 15-1 to 15-2
soil formation, 15-1 to 15-2
residual soil, 15-1
transported soil, 15-1 to 15-2
Soils, physical characteristics, 15-3 to 15-6
compactness, 15-4
effects of soil characteristics, 15-6
gradation, 15-4
Soils, physical characteristicsContinued
organic soils, 15-6
particle shape, 15-3
particle size, 15-3 .
soil moisture, 15-4 to 15-6
specific gravity, 15-4
Soil sampling, 15-7 to 15-17
disturbed samples, 15-9 to 15-11
quartering samples, 15-16 to 15-17
sampling methods, 15-7
tagging sampless, 15-9
undisturbed samples, 15-11 to 15-16
Soil testing, 15-17 to 15-34
Atterberg limits, 15-29 to 15-34
determining moisture content, 15-18 to
15-21
mechanical analysis, 15-21 to 15-25
specific gravity testing, 15-25 to 15-29
Splicing a tape, 12-23 to 12-25
Square, 4-6 to 4-7
Steel straightedge, 2-9 to 2-10
Stitch lines, 3-26
Stone masonry, 7-29 to 7-30
Straight lines, 4-1 to 4-3
bisection of a line, 4-2
division according to a given ratio, 4-3
division into any number of equal parts,
4-2 to 4-3
division into proportional parts, 4-3
Strength, good concrete, 7-2
Structural clay tile masonry, 7-26 to 7-29
physical characteristics, 7-28 to 7-29
uses for structural clay tile, 7-29
Structural drawings, 10-20 to 10-26
foundation plan, 10-21
framing plan, 10-22 to 20-26
Subflooring, framing, 6-17 to 6-18
Surveys, 14-25 to 14-43
as-built, 14-45
highways, 14-25 to 14-41
structural, 14-41 to 14-43
Symbols, electrical, 9-17
Symbols, mechanical, 8-21
fitting symbols, 8-22 to 8-23
fixture symbols, 8-24
piping symbols, 8-21 to 8-22
valve symbols, 8-23 to 8-24
T
T squares, 2-8 to 2-9
Tables with boards, drafting, 2-6 to 2-8
Tape corrections, making, 12-16 to 12-18
INDEX-13